촽ֱ

Central Asia Energy News Digest Issue 6 (31 March 2019)

Central Asia Energy News Digest Issue 6

Date:16-31 March 2019

Kyrgyzstan

Ministry of Finance and EDB sign an additional agreement for loan of US$ 100 million for the 2nd phase of Toktogul HPP rehabilitation

In Russian:

Russia remains the largest supplier of petroleum products to Kyrgyzstan

In Russian:

Gasification in Kyrgyzstan up at 30%

In Russian:

“Ruselprom” plans to invest US$ 1.5 billion in hydropower in the Kyrgyz Republic

In Russian:

Russia and Kyrgyzstan agree on cooperation in the field of solar energy

In Russian:

Severelectro plans to reconstruct 151.5 km of Bishkek’s overhead power lines in 2019

In Russian:

ADB approves US$ 100 million to modernize equipment and improve power generation at Uch-Kurgan hydropower plant

In Russian:

Prime Minister created a working group to develop proposals for reforming the Kyrgyz energy sector

In Russian:

IMF has found a way to increase electricity tariffs in Kyrgyzstan without upheavals and revolutions

In Russian:

Water levels of Toktogul reservoir dropped by 786 million cubic meters since March last year

In Russian:

Toktogul HPP rehabilitation project expected to cost US$ 275 million instead of US$ 415 million

In Russian:

Uzbekistan

International consortium invests US$ 5.2 billion in oil and gas development

In Russian:

Tuyabuguz hydropower station commissioned in Uzbekistan

In Russian:

President Shavkat Mirziyoyev visits “Masdar City”

In Russian:

President approved the reorganization of "Uzbekenergo"

In Russian:

Nuclear power and the protection of water bodies - urgent issues

In Russian:

Turkish Endüstriyel Elektrik to build a plant for the production of solar panels in Khorezm

In Russian:

Over 20 foreign companies submitted bids for the construction of a solar power plant in Uzbekistan

In Russian:

Turkish Yildirim Enerji Holding will build a new thermal power plant in Uzbekistan

In Russian:

Turkish Cengiz Enerji to build a new thermal power plant in the Bukhara region

In Russian:

Tajikistan

Gold instead of repayments for the Dushanbe CHP. Chinese companies granted rights for the development of two gold mines in Tajikistan

In Russian:

Tajikistan to repay China for the constructed power transmission line "Rogun-Dushanbe" within 25 years

In Russian:

Barqi Tojik: Power outages due to tariff non-payment

In Russian:

Total power outages continue in Tajikistan. Barqi Tojik silent

In Russian:

GE Renewable Energy will help increase the capacity of the Kairakkum Hydroelectric Power Plant to 174 MW

In Russian:

The capacity of the Nurek Hydroelectric Power Plant, the largest in Central Asia, will increase after reconstruction to 3,300 MW

In Russian:

The President launched the project for the modernization of the Nurek HPP

In Russian:

Tajikistan to export electricity to China

In Russian:

WB to provide US$ 24 million to Tajik villages along the line of the CASA-1000 project

In Russian:

Government of Tajikistan hosts discussions on ECT modernisation

In English:

Kazakhstan

Electric buses scheduled to service passenger route in Atyrau

In Russian:

Statement of the Ministry of Energy about the Kalamkas oil field accident

In Russian:

KZT 157 billion (US $ 411.7 mln.) to be allocated for gasification of the country

In Russian:

Sixty thousand people to get access to the gas network in 2019

In Russian:

Ministry of Energy announced gas prices for 2019

In Russian:

Ministry of Energy issues a forecast for gas production in 2019

In Russian:

Minister Bozumbayev: Kazakhstan’s participation in OPEC+ can significantly reduce market volatility

In Russian:

Kazakhs to save more than 28 billion tenge in 2019 due to tariff reductions

In Russian:

Five new renewable energy projects commissioned in January

In Russian:

Turkmenistan

ARETI signs memorandum on development of a large field in the Caspian basin

In Russian:

Donald Trump announces US support for Turkmen gas exports to Europe

In Russian:

Turkmenistan’s Caspian oil route

In Russian:

Turkmenistan intends to offer Japan to invest in TAPI project

In English:

Turkmenistan invites Bahrain to participate in TAPI gas pipeline project

In English:

Ashgabat hosts a meeting of the task force on regional energy cooperation in Central and South Asia

In Russian:

Analysis

How do electricity tariffs come together?

In Russian:

Announcements/ Opportunities

Announcement of planned auctions for renewable energy projects in Kazakhstan.

In Russian:

Events

Power Uzbekistan 15-17 May 2019

Website:


Phone: +996 (312) 915000 ext. 326, 327

Email: tspc@auca.kg

Address: 7/6 Aaly Tokombaev Street, Bishkek, Kyrgyz Republic 720060

 

FAQ


촽ֱ
7/6 Aaly Tokombaev Street
Bishkek, Kyrgyz Republic 720060

Tel.: +996 (312) 915000 + Еxt.
Fax: +996 (312) 915 028